Pembangkit ini dioperasikan oleh PT Supreme Energy Muara Laboh (SEML), perusahaan patungan PT Supreme Energy, ENGIE dan Sumitomo Corp. Sukses. liputan6. CARI. Home; News;

After successfully launching the commercial operation of Geothermal Power Plant (PLTP) Muara Laboh Phase I with a capacity of 85 MegaWatt (MW) in South Solok, West Sumatra, on 16 December 2019, PT Supreme Energy Muara Laboh (SEML) will increase the power plant capacity by 65 MW through the development of Phase II.

Prepared by PT Greencap NAA Indonesia for PT Supreme Energy Muara Laboh (PT SEML) This environmental management and monitoring plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

Supreme Energy Muara Laboh (PT. SEML) di Provinsi Sumatera Barat dan sudah beroperasi sejak Desember 2019. Dua proyek Supreme selanjutnya, yaitu pengembangan Panas Bumi Muara Laboh Unit-2 80 MW, dan eksplorasi PLTP Rajabasa 2 x 110 MW di Provinsi Lampung yang dikelola PT.
PT Supreme Energy Muara Laboh (SEML) memiliki komitmen yang tinggi terhadap program K3LL (Keselamatan dan Kesehatan Kerja serta Lindungan Lingkungan). Perusahaan menetapkan standar yang tinggi dalam penerapkan program K3LL untuk
33.333 percent of the shares of PT Supreme Energy Sumat era through INPEX GEOTHERMAL, LTD. PT Supreme Energy Sumatera is a subsidiary of PT Supreme Energy and holds a 30 percent share of the Project. The Muara Laboh Geothermal Power Plant is currently in commercial operation with a rated
PLTP Muara Laboh dikembangkan melalui PT SEML yang merupakan perusahaan patungan Supreme Energy, ENGIE dari Perancis dan Sumitomo Corp asal Jepang. Untuk PLTP Muara Laboh 1, SEML mengebor 18 sumur yang terdiri atas enam sumur eksplorasi dan 12 sumur produksi masing-masing sembilan sumur pengembangan dan tiga sumur injeksi. By PT Supreme Energy Muara Laboh (SEML), Rekind was appointed as a consortium with Sumitomo Corporation for the process of Engineering, Procurement, Construction (EPC). For the operation of the Muara Laboh PLTP Phase – 1, Monday (17/02) PT SEML conducted the Commercial Operation Ceremony of the PLTP with capacity of 85 MW. gfY3ie.
  • qir2owys6c.pages.dev/331
  • qir2owys6c.pages.dev/458
  • qir2owys6c.pages.dev/104
  • qir2owys6c.pages.dev/85
  • qir2owys6c.pages.dev/20
  • qir2owys6c.pages.dev/386
  • qir2owys6c.pages.dev/475
  • qir2owys6c.pages.dev/483
  • pt supreme energy muara laboh